Janesville, WI
Home MenuRuger Avenue Reconstruction
Project Location
Ruger Avenue, from Randall Avenue to Lexington Drive
Project Description
The City of Janesville, in collaboration with the Wisconsin Department of Transportation (WisDOT), is in the process of developing plans for the reconstruction of Ruger Avenue, between South Randall Avenue and South Lexington Drive in the City of Janesville. The Ruger Avenue reconstruction project is STP-Urban project administered by WisDOT which combines federal and local funds in a cost share.
Proposed improvements to the corridor include:
- Reconstruction of the pavement structure including curb and gutter
- Marked bicycle lanes
- Curb ramp replacement
- Spot replacement of sidewalk, storm sewer, water main, and sanitary sewer
Existing sidewalk will be evaluated for replacement in the coming months. Spot replacements are anticipated and will be special assessed to the adjacent property owner per Council policy 95.
The project will closely match the existing horizontal and vertical alignments. Right of way acquisitions and temporary limited easements for curb ramp improvements and grading are anticipated.
Parking will be removed from one side of the street within the project limits. The City and the design team have been evaluating parking needs on the corridor. Based on the analysis, the south side of the street has the capacity for 62 vehicles, while the north has the capacity to accommodate 50 vehicles. A portion of Craig High School’s athletic fields is also positioned along the south side of the corridor, which at times generates parking needs. Because of these two factors, the design team recommends removing parking from the north side of the street and allowing parking on the south side. The City is looking for feedback from residents regarding this recommendation. Feedback should be submitted by February 16, 2024.
Project Documents and Information
2024 Community Engagement Forum Materials: January 17, 2024
- Project Handout
- PowerPoint Presentation
- Parking on N Side
- Parking on S Side
- Project Typical Sections
- Project Detour
Schedule
- Community Engagement Forum #1: January 2024
- Preliminary Plans (60%): October 2024
- Community Engagement Forum #2 (if necessary: Fall/Winter 2024
- Real Estate Acquisition Process: November 2024
- Final Plans: August 2025
- Construction: Spring/Summer 2026
Contact Information
Karissa Chapman Greer
Project Engineer
Phone: (608) 755-3163
E-mail: chapmank@janesvillewi.gov